Kajang combines an older town centre and terraces from past decades with large newer townships towards Semenyih and Sungai Long, where new houses are still being built and handed over.
What we usually see in Kajang
Checking older roofs before panels go up
On houses from past decades, the roof decides the project. Clay tiles, older timber trusses, and past leak repairs are checked first, because fixing a roof is far easier before panels are mounted on it.
Terraces and semi-Ds with concrete tiles
Newer landed houses usually have concrete roof tiles and enough roof space facing east or west for a home system. Most owners ask how Solar ATAP applies to them and whether a battery is worth adding.
Planning solar for new homes
Owners of newly built or handed-over houses can plan panels, an EV charger, and a battery together, so cable routes and the DB box are prepared once instead of being redone later.




