Skip to content

Renovation contractor

Renovation contractor in Mont Kiara

Kitchen, bathroom, extension, and full-house renovation for landed homes and condos in Mont Kiara, by Just Reno by 0x.

Mont Kiara, Sri Hartamas and Damansara Heights are dominated by condominiums and high-end landed homes, with new towers and renovation projects constantly under way and strict management rules on contractors and working hours.

What we usually see in Mont Kiara

Condo renovations under management rules

Condominium renovations need management approval, a renovation deposit, set working hours, and lift protection. Hacking is often restricted, so bathroom and floor work is planned around noise limits and debris removal.

Kitchen and bathroom refreshes

Houses built in the 1990s and 2000s are reaching the age where the original kitchen, bathroom tiles, and paint need replacing. Most projects keep the layout and replace finishes, which is faster than moving plumbing.

Fitting out newly handed-over homes

Where new houses and condos are being handed over, most owners start with built-in kitchen and wardrobe cabinets, plaster ceilings, and lighting, ideally before moving in. Developer defects are best reported before renovation begins.

Full renovations with designer finishes

In upmarket neighbourhoods, many projects are full renovations with an interior designer: custom built-ins, wet and dry kitchens, and imported finishes, with management or residents' association rules on noise and working hours.

Common questions

Do you cover Mont Kiara?

Yes. Just Reno by 0x has confirmed it serves Mont Kiara. From the Sri Petaling base it is about 30–45 minutes off-peak, longer at rush hour, so share your full address when you book.

What does my condo management need before renovation starts?

Usually a renovation application, a refundable deposit, the contractor's details, and a work schedule within allowed hours. Ask the management office for their form early, as approval can take a few days.

Should I renovate before or after the developer fixes defects?

Report defects to the developer first and let them be repaired within the defect liability period. Renovating over a defect can make it harder to claim later.

Thinking about a renovation?

Tell us about the house and what you want to change. We will arrange a site visit and send a written quotation afterwards.