Renovations planned before the first wall comes down.

Just Reno by 0x renovates kitchens, bathrooms, and whole houses, and builds extensions for terrace, semi-D, and condo homes across Kuala Lumpur and Selangor.

Renovated terrace house kitchen with terrazzo-look floor tiles, oak cabinets, and a quartz island in late afternoon light.

Renovation contractor

Closed now · opens 10:00 AM

A renovation goes well or badly in the planning.

Most renovation trouble starts with something nobody checked: a wall that turns out to be structural, a condo rule about hacking hours, a worktop ordered before the cabinets were in. Just Reno by 0x plans the order of work, the approvals, and the materials before the site opens, then runs every trade to that plan.

Plan your renovation

Pick a project to see the stages it goes through, what to prepare, and whether it needs council or condo approval.

New layout, cabinets, worktop, tiles, and points for a wet or dry kitchen.

Typical time on siteAbout 4–6 weeks

Stages

  1. Measure and design

    Layout, cabinet drawings, worktop, and tiles agreed.

  2. Hacking

    Old cabinets, tiles, and screed removed.

  3. Piping and points

    Water, waste, gas, and power moved to the new layout.

  4. Tiling

    Floor and wall tiles laid and grouted.

  5. Cabinets and worktop

    Carcasses installed, worktop templated and fitted.

  6. Fit-out

    Sink, hob, and hood connected, then cleaned and handed over.

What to prepare

  • Photos of the current kitchen
  • Your appliance list and sizes
  • Gas tank or piped gas
  • Condo renovation permit, if you live in one

Approvals

Replacing a kitchen inside a landed home usually needs no council plan. Condos need a management renovation permit and deposit before work starts.

Kitchen renovation

Times are typical ranges for a terrace house or condo once materials are confirmed. Council approval, condo rules, made-to-measure items, and what is found behind old walls can make them longer.

Renovation services

Ten services, from a single bathroom to a full house or an extension at the back.

View all services

From site visit to handover

Five stages. The first two happen before anything on site changes.

  1. Site visit

    We measure, photograph, and talk through what you want, what you want to keep, and your timing.

  2. Quotation and plan

    A written scope, material list, schedule, and quotation. For extensions, plans go to the council.

  3. Work on site

    Trades work in order. You get progress photos, and stages are checked before the next one covers them.

  4. Defect walk

    We walk the house with you, list anything that needs fixing, and fix it.

  5. Handover

    Final clean, keys, and warranty details for the fittings and appliances installed.

How we run a renovation

  • Written scope and quotation

    Every item, material, and stage is listed in writing, so you know what is included before work starts.

  • Approvals sorted first

    Council plans for extensions, and condo renovation permits and deposits, are arranged before the site opens.

  • One team, one schedule

    Hacking, piping, tiling, ceilings, carpentry, and paint run in order under one site supervisor.

Common questions

See all questions
Where is Just Reno by 0x?

The office is at 5-G, Jalan Radin Anum 2, Bandar Baru Sri Petaling, 57000 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur. Site visits cover Kuala Lumpur and Selangor, including Sri Petaling, Bukit Jalil, Cheras, Puchong, Petaling Jaya, and Subang Jaya.

Do I need council approval to renovate?

Work that adds floor area, changes the structure, or alters the front of the house, such as an extension, needs plans approved by the local council. Replacing kitchens, bathrooms, floors, or paint inside the house usually does not, though some councils ask for a minor works permit.

What do I need to renovate a condo?

A renovation permit from the management, usually with a deposit, and the contractor's details. Most condos set hacking hours, ban work on Sundays and public holidays, and have rules for lift protection and debris.

How long does a kitchen or bathroom take?

A kitchen usually takes about 4 to 6 weeks on site, and a bathroom about 2 to 3 weeks, once materials are confirmed. Made-to-measure cabinets and worktops set most of the timing.

Visit the office

Office in Sri Petaling. Projects across the Klang Valley.

Material samples and drawings are reviewed at the office by appointment. Site visits cover Kuala Lumpur and Selangor.

Closed now · opens 10:00 AM

Address
5-G, Jalan Radin Anum 2Bandar Baru Sri Petaling57000 Kuala LumpurWilayah Persekutuan Kuala Lumpur
Open in Google Maps (opens in new tab)
Hours
Every day10:00 AM – 6:00 PM

Thinking about a renovation?

Tell us about the house and what you want to change. We will arrange a site visit and send a written quotation afterwards.