Skip to content

Renovation contractor

Renovation contractor in Sentul

Kitchen, bathroom, extension, and full-house renovation for landed homes and condos in Sentul, by Just Reno by 0x.

Sentul grew around the old railway workshops and still has older terraces and shophouses, while Sentul East and Sentul West are being redeveloped with condominium towers and new commercial blocks.

What we usually see in Sentul

Extensions and roof work on older houses

Older terraces are often extended at the back for a bigger kitchen, and their roofs and gutters have usually been patched several times. A site visit checks the roof, drainage, and existing extension work before any plan is drawn.

Condo renovations under management rules

Condominium renovations need management approval, a renovation deposit, set working hours, and lift protection. Hacking is often restricted, so bathroom and floor work is planned around noise limits and debris removal.

Upper floors of shop-houses

Upper floors of older shop-houses are often renovated into homes or offices. Expect older wiring, roof leaks, and narrow stair access that affects how materials are brought in.

Fitting out newly handed-over homes

Where new houses and condos are being handed over, most owners start with built-in kitchen and wardrobe cabinets, plaster ceilings, and lighting, ideally before moving in. Developer defects are best reported before renovation begins.

Common questions

Do you cover Sentul?

Yes. Just Reno by 0x has confirmed it serves Sentul. From the Sri Petaling base it is about 20–30 minutes off-peak, longer at rush hour, so share your full address when you book.

Do I need council approval to extend my house?

Structural extensions usually need plans submitted to your local council before work starts. The site visit covers what your extension involves, so you know what to ask the council and what documents to prepare.

What does my condo management need before renovation starts?

Usually a renovation application, a refundable deposit, the contractor's details, and a work schedule within allowed hours. Ask the management office for their form early, as approval can take a few days.

Should I renovate before or after the developer fixes defects?

Report defects to the developer first and let them be repaired within the defect liability period. Renovating over a defect can make it harder to claim later.

Thinking about a renovation?

Tell us about the house and what you want to change. We will arrange a site visit and send a written quotation afterwards.